Design and supervision of the cableway on Stroggyli islet in Greece

Study and supervision of the construction of the aerial freight cableway in Stroggyli island near Kastelorizo. This project was constructed for the Greek military unit, which is located on the small island and it is useful for the transportation of the goods between the small marina and the existing military base.

Key technical information of the project:

  • Length 324 m
  • Carrying capacity 200 kg
  • Materials: steel and reinforced concrete, wire, anchors
  • Works duration 9 months
  • Budget 71,500 €
  • Pattern mechanism of axis motion and third body certification